Calculate baseline as:
Specify how the baseline findings measurements should be calculated.
The following test measurements are considered when forming the baseline measurement:
• | those specified in the Baseline Time Window, |
• | those flagged as baseline, and |
• | those taken prior to Study Day 1. |
Choose Last recorded pre-dose measurement to use the last recorded pre-dose test measurement (out of the test measurement pool generated from the above list) as the baseline measurement. This option is specified by default.
Choose Mean of recorded pre-dose measurements to average these pre-dose test measurements to form the baseline measurement.
Note: If the variable xxBLCHG exists and the Baseline Time Window is left blank, this option is ignored when Change from baseline is chosen as Plot findings measurements as:.