Duration Time Scale to Plot on x-Axis

Select the time unit scale to plot on the X-axis for the swimmer plot for the duration of response evaluation.

Available time metrics are listed in the following table:

Time Metric

Function

Days

Choose this option to measure total duration in days.

Weeks

Choose this option to measure total duration in weeks.

Months

Choose this option to measure total duration in months.
This option is specified by default.

To Specify the Time Scale:

8 Click the appropriate radio button.