Offset for Censor End Date (in Study Days)
Use this option to specify the number of days to extend your analysis after the date specified using the End Date Variable to Use for Censoring option.
To Specify an Offset:
8 | Either enter the desired value in the text field or click the Up or Down arrows to change the value. |