Offset for Censor End Date (in Study Days)
Use this field or slider to specify the number of days to extend your analysis after the date specified using the End Date Variable to Use for Censoring option.
To Specify an Offset:
8 | Either enter the desired value in the text field or move the slider to the right or to the left to change the value. |
Tip: To change the scale of the slider, right-click on the slider and select from the pop-up menu. Change the upper or lower boundaries in the that appears, to rescale the slider and click .