Use this field to specify at least three (3) numeric variables for which to construct a path diagram.Caution : Specifying a large number of variables can greatly increase computation time and/or produce a graph that is too complex to interpret.All of the variables in the specified data set are displayed in the Available Variables field.
Highlight the desired variables. To highlight multiple variables at once, hold down while left-clicking on them.
Click to add the highlighted variables to the Variables to Plot field, as shown below: