Process Performance Graph

The Process Performance Graph in the Process Screening platform is a four-quadrant plot of capability versus stability. Each process for which specification limits are provided is represented by a marker. The marker type depends on if the process violates guidelines for the Target Index and Cp values. A left-pointing triangle indicates the process is below target, a circle indicates the process is on target, and a right-pointing triangle indicates the process is above target. An open marker indicates that the variation of the process is adequate and a filled marker indicates that the variation of the process could be reduced. A complete description of the marker combinations is provided in Table 8.1. Additionally, if you define importance values for the processes, the markers on the Process Performance Graph are sized by importance.

Table 8.1 Process Performance Graph Markers

Graph Marker

Target Index

Cp

Image shown here

On Target

Adequate Variation

Image shown here

On Target

Reduce Variation

Image shown here

Above Target

Adequate Variation

Image shown here

Above Target

Reduce Variation

Image shown here

Below Target

Adequate Variation

Image shown here

Below Target

Reduce Variation

On the graph, the horizontal coordinates represent the stability index of the process and the vertical coordinates represent the capability of the process, given as Ppk. The graph is divided into four quadrants based on the following default boundaries:

A stability index that exceeds 1.25 indicates that the process is unstable.

A Ppk that is smaller than 1.33 indicates that the process is not capable.

Additionally, there is a red line on the graph at 1.33 divided by Stability Index that indicates where the Cpk value is 1.33. This line categorizes the processes in the unstable and incapable quadrants in terms of how they might be fixed. Processes below the red line are fixable by special causes; processes above the red line are fixable by reducing variability. Selecting points in the graph selects the corresponding processes in the Summary table.

Tip: Hover over a point in the Process Performance Graph to view a graphlet of the control chart for that process. Click the Quick Graph to add it to the report window. To change the settings of the graphlets, see Chart Settings.