Reliability and Survival Methods > Reliability Forecast > Example of the Reliability Forecast Platform
Publication date: 07/08/2024

Example of the Reliability Forecast Platform

You have data on seven months of production and returns. You want to use this information to forecast the total number of units that will be returned for repair through February 2011. The product has a 12-month contract.

1. Select Help > Sample Data Folder and open Reliability/Small Production.jmp.

2. Select Analyze > Reliability and Survival > Reliability Forecast.

3. On the Nevada Format tab, select Sold Quantity and click Production Count.

4. Select Sold Month and click Timestamp.

5. Select the other columns and click Failure Count.

6. Click OK.

Figure 10.2 Observed Data Report 

Observed Data Report

In the Observed Data report, the bottom left shows bar charts of previous failures. Cumulative failures are shown in the line graphs on the right. Note that production levels are fairly consistent. As production accumulates over time, more units are at risk of failure, so the cumulative failure rate gradually increases. The consistent production levels also result in similar cumulative failure rates and counts from month to month.

7. Click the Life Distribution disclosure icon.

JMP fits production and failure data with a Weibull distribution using the Life Distribution platform (Figure 10.3). JMP then uses the fitted Weibull distribution to forecast returns for the next five months (Figure 10.4).

Figure 10.3 Life Distribution Report 

Life Distribution Report

The Forecast report shows previous production in the left graph (Figure 10.4). In the right graph, you see that the number of previous failures increased steadily over time.

Figure 10.4 Forecast Report 

Forecast Report

8. In the Forecast report, type 12 for the Contract Length.

9. In the left Forecast graph, drag the animated hotspot over to July 2010 and upward to approximately 3500.

Orange bars appear in the left graph to represent future production. The monthly returned failures in the right graph increase gradually through August 2010.

Figure 10.5 Production and Failure Estimates 

Production and Failure Estimates

10. In the left graph, drag the February 2010 hotspot to approximately 3000 and then drag the March 2010 hotspot to approximately 3300.

11. In the right graph, drag the right hotspot to February 2011.

JMP estimates that the number of returns will gradually increase through August 2010 and decrease by February 2011.

Figure 10.6 Future Production Counts and Forecasted Failures 

Future Production Counts and Forecasted Failures

Want more information? Have questions? Get answers in the JMP User Community (community.jmp.com).